What's included

Seis pasos desde el pedido hasta la primera lata correcta.

01

Engineering review

Engineering call to confirm tube dimensions, target speed, and floor constraints. Layout sketch returned on request.

02

Build & pre-shipment FAT

Machine built and tested for 4 hours on your stock or a close equivalent. Video and test report delivered with the machine.

03

Export crating & shipping

ISPM-15 compliant wooden crate, vacuum-sealed electrical panel, full export documentation handled in-house.

04

In situ engineer dispatch

A Qingdao Senmei commissioning engineer travels to your factory, supervises unloading and positioning.

05

Installation & commissioning

Mechanical alignment, electrical wiring, and integration with your upstream/downstream equipment.

06

Formación del operador & SAT

Two-day operator training and a final site acceptance test. We don't leave until the line is producing at rated throughput.

Typical timeline

La mayoría de las líneas se ponen en marcha en un plazo de 60 days of order.

The exact schedule depends on the configuration and your factory readiness, but here's what most customers see for a single-machine order.

Order to engineering reviewConfirmed per inquiry
Engineering review to FAT25 – 35 working days
FAT to dispatchConfirmed per inquiry
Ocean freight (FCL)18 – 28 days
Customs clearance & inland3 – 7 days
In situ commissioning5 – 10 working days
Formación del operador & SAT2 working days
What's not included

Para total transparencia.

  • VAT, import duties, and local taxes — handled by your customs broker.
  • Air freight differential — quoted separately if you need the machine faster than ocean allows.
  • Local construction — concrete pads, electrical drops to the panel, and any upstream/downstream equipment integration are your scope.
  • Operator payroll during training — your operators are paid by you; we cover the engineer.
  • Spare parts after warranty — separately quoted; we keep common wear parts in stock for 10+ years per model.